York YR Manual de Serviço

Consulte online ou descarregue Manual de Serviço para Compressores de ar York YR. York YR Technical data Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 60
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
YR
STYLE:
REFRIGERANT:
A
R134a
ROTARY SCREW LIQUID CHILLER
GB
INSTALLATION, COMMISSIONING,
OPERATION AND MAINTENANCE
160.81-ICOM-GB0 (01/02)
Vista de página 0
1 2 3 4 5 6 ... 59 60

Resumo do Conteúdo

Página 1 - ROTARY SCREW LIQUID CHILLER

YRSTYLE:REFRIGERANT:AR134aROTARY SCREW LIQUID CHILLERGBINSTALLATION, COMMISSIONING,OPERATION AND MAINTENANCE160.81-ICOM-GB0 (01/02)

Página 2

Thermal & Acoustic Materials DataHealth Hazard & First Aid Toxicity Index <10 to NES713 Issue 3 (1991): Non-hazardous, non-toxic. No firsta

Página 3 - Table of Contents

2 Product Description2.1 General (Figure 2.1)The York YR Rotary Screw Liquid Chiller is primarilyused for large air conditioning systems, but may be u

Página 4 - I-ii 160.81-ICOM-GB0 (01/02)

Oil is injected into the compressor by differentialpressure to lubricate the bearings, seal the rotors andremove the heat of compression. The injected

Página 5 - 1 SUPPLIER INFORMATION

In the first stage of oil separation, high velocity oil andrefrigerant gas in the compressor discharge lineundergoes a rapid reduction in velocity as

Página 6 - 1-2 160.81-ICOM-GB0 (01/02)

2.9 EvaporatorThe evaporator is a shell and tube, flooded type, heatexchanger with a distributor trough providing uniformdistribution of refrigerant o

Página 7

2.15 Options and AccessoriesModel 'B' Solid State StarterThe liquid cooled solid state starter is a reduced voltagesoft starter that control

Página 8 - 1-4 160.81-ICOM-GB0 (01/02)

2.16 Nomenclature2-6 160.81-ICOM-GB0 (01/02)Evaporator CodeTB, TC, TD, VB, VC, VDCondenser Code Motor CodeTB, TC, TD, VB, VC, VD 50 = 380/400-3-50 55

Página 9 - 160.81-ICOM-GB0 (01/02) 1-5

3 TRANSPORTATION, RIGGING AND STORAGE3.1 GeneralYR units are shipped as a single factory assembled,piped, wired package, requiring minimum installatio

Página 10 - 1-6 160.81-ICOM-GB0 (01/02)

Form 3 – Motor/Compressor Separate From ShellsShipped as three major assemblies. Unit firstfactory assembled, refrigerant piped, wired andleak tested;

Página 11 - 2 Product Description

3.4 RiggingThe complete standard unit is shipped without skids.(When optional skids are used it may be necessary toremove the skids so riggers skates

Página 13

Page Left Intentionally Blank3-4 160.81-ICOM-GB0 (01/02)

Página 14 - 2-4 160.81-ICOM-GB0 (01/02)

4 INSTALLATION4.1 LocationYR units are furnished with vibration isolator mounts forbasement or ground level installations. Units may belocated on uppe

Página 15

Checking the Isolator Pad DeflectionAll isolator pads should be checked for the properdeflection while checking to see if the unit is level. Eachpad s

Página 16 - 2-6 160.81-ICOM-GB0 (01/02)

4.8 Evaporator and Condenser Water PipingThe evaporator and condenser liquid heads havenozzles which are grooved, suitable for welding 10.6 barDWP fla

Página 17

4.10 Glycol SolutionsFor unit operation with chilled liquid temperaturesleaving the evaporator at below 4°C, glycol solutionsshould be used to help pr

Página 18 - 3-2 160.81-ICOM-GB0 (01/02)

4.17 Unit PipingCompressor lubricant piping and system external pipingare factory installed on all units shipped assembled. Onunits shipped dismantled

Página 19 - Spreader Bars

Route the cables forming the 3 phase power supply viathe same hole in the motor terminal box gland plate,using a suitable cable gland, to ensure that

Página 20 - 3-4 160.81-ICOM-GB0 (01/02)

4.20 Control ConnectionsCustomer voltage free contacts must besuitable for device contact rating to be 5 mA at115 Vac. If the voltage free contacts fo

Página 21 - 4 INSTALLATION

4.20.8 Remote Current Limit Setpoint - PWM(TB4 terminals 1 & 20)The motor current limit setpoint can be adjustedremotely bya1to11second timed clos

Página 22 - 4-2 160.81-ICOM-GB0 (01/02)

4.21.5 Safety Shutdown(TB2 terminals 42 & 43)When closed, these contacts signify the unit is notpermitted to start due to one or more safety contr

Página 23

Table of Contents1 SUPPLIER INFORMATION1.1 Introduction 1.11.2 Warranty 1.11.3 Safety 1.11.4 Responsibility for Safety 1.11.5 About this Manual 1.21.6

Página 24 - 4-4 160.81-ICOM-GB0 (01/02)

4-10 160.81-ICOM-GB0 (01/02)SFSFTB4COOLINGLIQUIDCOOLINGLIQUID PUMPCHILLEDLIQUID PUMPREMOTE/LOCALCYCLINGMULTI UNITSEQUENCEAUXILIARY SAFETYSHUTDOWNREMOT

Página 25

5 COMMISSIONING5.1 PreparationCommissioning of this unit should only becarried out by York authorised personnel.The Operating Instruction manual must

Página 26 - 4-6 160.81-ICOM-GB0 (01/02)

5.2 First Time Start-upDuring the commissioning period there shouldbe sufficient heat load to run the unit understable full load operation to enable t

Página 27 - varies linearly with

6 OPERATIONIf the oil heater is de-energised during ashutdown period, it must be energized for 24hours prior to starting the compressor.6.1 GeneralYR

Página 28 - 4-8 160.81-ICOM-GB0 (01/02)

3. The chilled liquid pump contacts close starting thechilled liquid pump to allow liquid flow through theevaporator. The chilled water flow switch is

Página 29

6.7 Prolonged ShutdownsIf the unit is to be shut down for an extended period oftime (for example, over the winter season), the followingprocedure shou

Página 30 - 4-10 160.81-ICOM-GB0 (01/02)

6.9 Operating Log SheetAn accurate record of system operating conditions(temperatures and pressures) recorded at regularintervals throughout each 24 h

Página 31 - 5 COMMISSIONING

7 MAINTENANCEThe Safety Section of this manual shouldbe read carefully before attempting anymaintenance operations on the unit. Thissection should be

Página 32 - 5-2 160.81-ICOM-GB0 (01/02)

7.2 Special Maintenance RequirementsIn addition to the regular maintenance schedule, thereare some further special requirements for maintenanceof the

Página 33 - 6 OPERATION

7.3 Regular Maintenance OperationsService Schedule MINOR SERVICE( 3 - 6 monthly ) *MAJOR SERVICE ( 6 - 12 monthly ) *All items under Minor Service plu

Página 34 - 6-2 160.81-ICOM-GB0 (01/02)

4.21 Status Connections 4.84.21.1 Remote Mode - Ready to Start4.21.2 Run Contacts4.21.3 Anticipatory Alarm4.21.4 Cycling Shutdown4.21.5 Safety Shutdow

Página 35

7.4 Oil Filters and DriersA single oil filter is provided as standard equipment anddual oil filter arrangements are available as optionalequipment. Th

Página 36 - 6-4 160.81-ICOM-GB0 (01/02)

4. Loosen the Rota-Lock®Nuts at each end of the filterdriers. Remove the filter driers.5. Teflon®seal washers are used to seal the filter drierconnect

Página 37 - 7 MAINTENANCE

7.6.3 Vacuum TestingVacuum testing should be conducted as follows:1. Connect a high capacity vacuum pump, withindicator, to the system charging valve

Página 38 - 7-2 160.81-ICOM-GB0 (01/02)

7.7.1 Chemical Water TreatmentSince the mineral content of the water circulated throughthe evaporator and condenser varies with almost everysource of

Página 39 - 160.81-ICOM-GB0 (01/02)

7.7.4 Tube LeaksEvaporator and condenser tube leaks may result inrefrigerant leaking into the water circuit, or water leakinginto the shell depending

Página 40 - 7-4 160.81-ICOM-GB0 (01/02)

7.9 Testing Motor Winding InsulationWith the main disconnect switch and compressor motorstarter open, test the motor as follows:1. Test the insulation

Página 41 - 7.6.2 Leak Testing

Page Left Intentionally Blank7-10 160.81-ICOM-GB0 (01/02)

Página 42 - 7-6 160.81-ICOM-GB0 (01/02)

8 TROUBLE SHOOTING8.1 General RequirementsUnits are not generally user serviceable and no attemptshould be made to rectify any faults found with the u

Página 43 - 7.7.2 Tube Cleaning

8-2 160.81-ICOM-GB0 (01/02)Fault Possible Cause RemedyTemperature of chilled water too lowwith low motor current.Insufficient load for system capacity

Página 44 - 7-8 160.81-ICOM-GB0 (01/02)

9 TECHNICAL DATA9.1 DimensionsNotes1. Unit height includes steel mounting plates under tube sheets. To determine overall installed height,add 22 mm fo

Página 45

1 SUPPLIER INFORMATION1.1 IntroductionYork YR chillers are manufactured to the highest designand construction standards to ensure highperformance, rel

Página 46 - 7-10 160.81-ICOM-GB0 (01/02)

9.2 Solid State Starter Details (Optional)9.3 Weights9-2 160.81-ICOM-GB0 (01/02)TOP VIEWMOTOR/COMPRESSORPOWER WIRING ENTRANCE COVER WITH22 mm Ø KNOCKO

Página 47 - 8 TROUBLE SHOOTING

9.4 Process and Instrumentation Diagram160.81-ICOM-GB0 (01/02)9-3

Página 48 - 8-2 160.81-ICOM-GB0 (01/02)

9.5 Water Box Nozzle Arrangements9-4 160.81-ICOM-GB0 (01/02)In OutAHHA11-PASSNozzle ArrangementsNo. ofPassesEvaporatorIn OutCBKJ2NOTE: Water must ente

Página 49 - 9 TECHNICAL DATA

160.81-ICOM-GB0 (01/02) 9-5CCDDDDBBBBBBBBDDDDPSWYVXURTQCCGGGGGG GGGGGG25.4 mm25.4 mm25.4 mm25.4 mm25.4 mm25.4 mmCONDENSERCONDENSERCONDENSERMOTOR ENDMO

Página 50 - 9-2 160.81-ICOM-GB0 (01/02)

Page left intentionally blank9-6 160.81-ICOM-GB0 (01/02)

Página 51

10 SPARE PARTSIt is recommended that the following common spareparts are held for preventative of correctivemaintenance operations.Other spare parts v

Página 52 - 9-4 160.81-ICOM-GB0 (01/02)

Page left intentionally blank10-2 160.81-ICOM-GB0 (01/02)

Página 53 - 160.81-ICOM-GB0 (01/02) 9-5

11 DE-COMMISSIONING, DISMANTLING AND DISPOSALNever release refrigerant to theatmosphere when emptying therefrigerating circuits. Suitable retrievalequ

Página 54 - 9-6 160.81-ICOM-GB0 (01/02)

Page left intentionally blank11-2 160.81-ICOM-GB0 (01/02)

Página 55 - Required

ItalyKazakhstanLatviaLithuaniaNederlandPolandPortugalRomaniaRussiaYORK International20051 Limbiate (Milan)Via Manara 2ItaliaTel: ++39/0299450.1Fax: ++

Página 56 - 10-2 160.81-ICOM-GB0 (01/02)

1.5 About this ManualThe following symbols are used in this document to alertthe reader to areas of potential hazard.A Warning is given in this docume

Página 57

Subject to change without noticeALL RIGHTS RESERVEDPart No. 160.81-ICOM-GB0 (01/02)YORKEuropeYORK INTERNATIONALZ.I. 14 rue de Bel Air, B.P.44473 Carqu

Página 58 - 11-2 160.81-ICOM-GB0 (01/02)

Refrigerants and OilsRefrigerants and oils used in the unit are generallynon-toxic, non-flammable and non-corrosive, and poseno special safety hazards

Página 59

1.9 Material Safety DataRefrigerant Data:Safety Data R134aToxicity Low.In contact with skin Liquid splashes or spray may cause freeze burns. Unlikely

Página 60

Spill/leak procedure Ensure suitable personal protective clothing and respiratory protection is worn.Provided it is safe to do so, isolate the source

Comentários a estes Manuais

Sem comentários